Compare four HBT electric and four DHBT diesel trailer-pump configurations, with theoretical outputs of 40–80 m³/h and separate model-specific pressure and delivery-distance entries.

  • Electric HBT and diesel DHBT model groups
  • 40–80 m³/h theoretical volume across documented models
  • Separate pressure and delivery-distance entries
Request a configuration

Model data is supplied by the client. Configuration and operating conditions need confirmation for your order.

Overview

A trailer concrete pump receives prepared concrete and conveys it through a delivery line. It is a pumping unit rather than a concrete batching plant or an integrated mixer. Selection begins with the concrete supply, pipe route and intended rate of placement.

EPDAS documents four HBT electric-motor models and four DHBT diesel models. Their theoretical outputs span 40–80 m³/h. The tables separately identify pressure, vertical and horizontal delivery entries, motor or engine power and machine dimensions.

A trailer chassis helps define the equipment format. It does not establish public-road towing approval or the requirements for transport in a particular destination.

Select Electric or Diesel Power for the Site

HBT Electric-Motor Group

HBT40S-10-45, HBT50S-12-55, HBT60S-13-90 and HBT80S-13-110 list 40, 50, 60 and 80 m³/h theoretical output. Their motor powers are 45, 55, 90 and 110 kW. Confirm the electrical package and available site supply together.

DHBT Diesel Group

The four DHBT models list 60 or 80 m³/h output, with engine powers of 118–174 kW. Models carrying similar output entries can have different pressure entries, so compare the full column rather than output alone.

EPDAS HBT and DHBT Specifications

Both original technical matrices are retained. In the electric group, HBT60S-13-90 and HBT80S-13-110 list 12.5 MPa delivery pressure; the model name does not replace the numeric row. Review the exact configuration in the supply specification.

Electric-motor trailer pumps
ItemsUnitsHBT40S-10-45HBT50S-12-55HBT60S-13-90HBT80S-13-110
Theoretical max. discharging volumem³/h40506080
Theoretical max. delivery pressureMpa101212.512.5
Delivery distance Verticalm120150180180
Delivery distance Horizontalm300350700700
Distribution valve typeS valveS valveS valveS valve
Hopper capacityL600600600600
Feeding heightmm1400140014001400
Inner dia. of delivery pipemmΦ125Φ125Φ125Φ125
Main motor powerKw455590110
Dimension (length ×width ×height)mm4970×1680×25805270×2000×18406170×1800×21006170×1930×2100
Overall weightKg3200350051005200
Diesel trailer pumps
ItemsUnitsDHBT60-13-118DHBT60-16-145DHBT80-13-145DHBT80-16-174
Max. Theoretic delivery volumem³/h60608080
Max. Theoretic delivery pressureMpa12.515.712.515.7
Max. Theoretic delivery heightm180250180250
Max. Theoretic delivery distancem70010007001000
Type of distribution valveS valveS valveS valveS valve
Hopper capacityL600600600600
Inner diameter of delivery pipemmΦ125Φ125Φ125Ф125
Diesel engine powerKw118145145174
Max. Oil pressure of main systemMPa32323232
Max. Oil pressure of mixing systemMPa14141414
Dimension (length ×width ×height)mm6600×1930×21906600×1930×21906600×1930×21906600×1930×2190
Overall weightKg5500600060006500

All pumping output and distance entries are theoretical. Maximum pressure, output, horizontal distance and height are separate limits; the concrete and project pipeline require technical assessment.

Receiving Hopper, Pump and Pipeline

Concrete Receiving Arrangement

Both groups list a 600 L receiving hopper and S distribution valve. The hopper is part of receiving and feeding concrete into the pumping system; its volume is not the output per pumping stroke.

Delivery Line

The source specifies a 125 mm delivery-pipe inner diameter. Diameter alone does not confirm the pressure rating, wall condition, couplings or suitability of a complete delivery line.

Power and Hydraulic Systems

Electric motor power and diesel engine power are shown in separate tables. The diesel table also separates main-system and mixing-system oil pressures from concrete delivery pressure.

How a Trailer Pump Supports Placement

Prepared concrete is supplied to the receiving hopper. The pumping mechanism moves suitable material through a distribution system and into the delivery pipe, while the receiving and placing operations must remain coordinated.

The line determines where concrete arrives; a trailer pump does not include an articulated placing boom simply because it can pump over distance. The arrangement at the delivery end is a separate part of project planning.

This is a general process description. Operating steps, cleaning and any intervention on the equipment or line require the applicable manual and qualified personnel.

Compare Output, Pressure and Route Together

The electric table lists horizontal delivery entries of 300–700 m and vertical entries of 120–180 m. The diesel group lists theoretical distances of 700–1,000 m and heights of 180–250 m. These figures do not certify a particular project route.

Higher pressure entries do not mean maximum output and maximum distance occur simultaneously. Elevation, line length, bends and the concrete’s pumping characteristics must be evaluated for the actual configuration.

Coordinate Concrete Delivery with Pump Demand

A larger pump cannot sustain placement without a suitable, continuous concrete supply. Review truck arrival or mixing arrangements and the receiving space before treating a nominal output as a project production rate.

Confirm concrete pumpability against the selected system. The supplied matrices do not provide a complete aggregate-grading, slump or mix-design schedule, so values from another pump page should not be copied into this equipment specification.

Assess Fixed-Line Concrete Delivery

Delivery Through a Planned Pipeline

A routed pipeline can be considered where prepared concrete must travel beyond a convenient direct-discharge point. Access at the pump and the ability to support the route are as important as the nominal distance.

Working with Separate Placing Equipment

Where the final placement area changes, a compatible separate placing boom may be assessed as part of the system. Compatibility, pressure limits and site support need confirmation; a separate boom is not automatically included.

Arrange Receiving Access and Line Support

The electric group lists a 1,400 mm feeding height. Check the actual receiving arrangement against the supplying equipment and allow room for its approach, discharge and departure.

Review the pump position, delivery-line support, crossing points and placement access as a complete layout. Machine dimensions and trailer format do not replace installation instructions or a transport plan.

Trailer Concrete Pump equipment-type illustration
Equipment-type illustration; exact order configuration may vary

Match Power and Cleaning Resources

For electric units, confirm the connection and starting requirements for the actual motor package. For diesel units, consider fuel supply, exhaust and service access for the operating site.

Residual concrete and wash-water handling need planned locations and approved procedures. Include cleaning resources in the project arrangement instead of leaving them until pumping has finished.

Inspect the Pump and the Complete Line

Wear occurs in pumping components and in the delivery system. Inspection should cover the items and limits specified in the manual, including line components and connections; this page does not prescribe a troubleshooting or blockage-clearing procedure.

Agree manuals, commissioning assistance, operator familiarization and spare-part support with EPDAS. Maintenance intervals, commercial terms and technical response arrangements remain specific to the order.

Evaluate the Installed Pumping System

The complete cost includes the unit, power arrangements, delivery line, receiving access and cleaning resources. A theoretical long-distance rating is not a list of supplied pipes and accessories.

Compare the required pressure and practical placement rate before paying for a larger package. Include wear parts, line inspection and downtime planning in the ownership comparison without assuming a fixed cost per cubic metre.

Frequently Asked Questions

Does a trailer pump mix concrete?

This equipment receives prepared concrete and pumps it. An integrated mixer is not established by these tables.

Which power options are shown?

Four HBT electric-motor models and four DHBT diesel models are listed separately.

What theoretical output range is listed?

The documented models span 40–80 m³/h. Actual placement depends on the concrete supply and delivery arrangement.

Are models with equal output identical?

No. For example, the DHBT group includes different pressure entries for models listing the same theoretical output.

What hopper capacity is listed?

Both groups list 600 L. Hopper capacity is separate from hourly pumping output.

What pipe diameter is shown?

The source lists a 125 mm delivery-pipe inner diameter. Confirm the complete line specification for the project.

Does a 1,000 m entry guarantee my route?

No. It is a theoretical source entry. Pipe layout, elevation and concrete require project-specific assessment.

Are hydraulic oil pressure and concrete pressure the same?

No. The diesel matrix lists separate oil-system and concrete-delivery pressures. Keep their labels attached.

Can it be towed on any public road?

Trailer format alone does not establish towing approval. Verify transport requirements for the actual equipment and destination.

Is a placing boom part of the pump package?

Not automatically. A separate boom, its compatibility and supply scope must be confirmed independently.

Manufacturing & product evidence

EPDAS identifies specialized manufacturing bases for the relevant equipment families.

Trailer Concrete Pump equipment reference
Equipment reference · exact order configuration and model-specific inspection evidence require confirmation

Pending confirmation. Model-specific inspection and certification evidence remains to be confirmed.

Compare an EPDAS Trailer Pump for Your Delivery Line

Discuss the documented configuration with EPDAS and review how it fits your concrete supply and placement plan. Final equipment, documentation and support scope are confirmed for the order.

Discuss Trailer Pump Configurations

HOMEPAGE REVIEW

This page is included in the approved plan. Its full content will be prepared after the homepage review.

Discuss your requirements